Conditioning of Submarine Recovery facilities in Santander

December, 2016 to April, 2017

Screening of land mixed with inert waste has been carried out in the old facilities of Recuperaciones Submarinas, in Punta Parayas (Santander). This is a plot of 110,000 m2 where the ship dismantling was carried out. That is why, currently, and already ceased the activity, the plot was with numerous types of waste. The work has consisted of a previous selection of the voluminous waste, with backhoe with clamp, removing the woods, concrete blocks, wheels and tires, rubber .... These wastes have been loaded onto a transport truck and managed at an authorized landfill.

Subsequently, through a selection of materials, the rest of the lands have been screened, in the way that the smaller residues have been separated, leaving the lands cleaned apart. The rejection of this screening, once the ferric material has been removed for recovery, has been managed by an authorized landfill. Clean lands have subsequently spread on the plot.
It has also been the inerting and wear of various tanks in the plot, with fuel and hydrocarbons, as well as the management of lands contaminated with hydrocarbons.

Tirso, acondicionamiento punta parayas
Top