Dismantling a concrete plant, owned by CEMEX, in Guarnizo (Cantabria). The facility consisted of a kneader, hoppers and a conveyor.
For these scrapping jobs, it has been used a backhoe with long reaching shear. To lower the cement deposits, it has been needed a special team provided with oxyfuel cutters, who has worked from a lifting platform of 32 meters high, with the support of a self-propelled crane. The cut pieces were loaded to transport truck for further recovery.