SCRAPPING BRINE TANK IN SOLVAY
Noviembre, 2015
Scrapping an old brine tank of carbon steel 10 meters high and 14 meters in diameter.
This deposit was within the facilities of the company SOLVAY, in the town of Barreda (Cantabria).
The work has been done with hydraulic shears coupled to backhoe. The difficulty of the work lay in the existence of hydrogen pipes very close to the tank, forcing a demolition directed inwardly thereof, necessarily maintaining the next pipe in service. The scrapped tank portions were cut by torch and loaded on trucks for transport and subsequent recovery.
- Ver Proyecto<span class="element-invisible">: SCRAPPING BRINE TANK IN SOLVAY</span>